CONTACT

Plant construction for the pharmaceutical and cosmetics industry is our profession. With more than 20 years of expertise, first ideas become products of the highest quality.

Which project can we support you with?

Planttech Engineering GmbH - Headquarters
Louis-Berger-Weg 7-9
59379 Selm-Bork

phone: +49 (0) 25 92 / 91 505-0

mail: mail(AT)planttech.de

I agree that my contact details and assignment will be stored permanently for any queries. Note: You can revoke this consent at any time with effect for the future by sending an email to mail(AT)planttech.de.

Glossary:

Performance Qualification (PQ)

The PQ (Performance Qualification) is the documented proof that the system delivers a constant product quality with a high degree of safety. For this purpose, the performance qualification of ultrapure water systems is usually carried out in three phases (Inspection of High Purity Water Systems):

  • Phase I (2-4 weeks)
    Run-in of the system and determination of work instructions and sanitization cycles. Sampling and analysis of each sampling point according to the sampling plan.
  • Phase II (2-4 weeks)
    Demonstrate that the facility can be properly operated with the determinations made in Phase I while meeting water quality requirements. Sample and analyze each withdrawal and sampling point in accordance with the sampling plan.
  • Phase III (52 weeks)
    Demonstrate that the facility can be operated properly over the long term, including consideration of changing raw water quality, while meeting water quality requirements. Sampling and analysis of each withdrawal and sampling point in accordance with the sampling plan as routine testing after completion of the PQ.

Relevant Subpages

Related Tags